LAX Signage and Wayfinding Project
Install power and lighting to new signage in CTA and to sign structures on Century/Sepulveda Blvd.’s.
Completed: 2004
Contr.: Peterson/Chase Construction
MTA 03-0020 Vertical Storage Carousel at MTA Div. 11, 21, 22
Installation of power to Vertical Storage Material Parts Carousels.
Completed: 2004
Contr.: A&P Construcrion
MTA CO678 – ADA Compliance at Division 5
Upgrade the existing fire alarm system.
Completed: April 2003
Contr.: Larry Brown Construction
MTA CO651 – RRC Chemical Build & Employee Lounge
Electrical.
Completed: August 2003
Contr.: A&P Construction
MTA Division 8 Vault Houses
Electrical and Communications installation of (2) Vault Houses.
Contr.: A&P Construction
MTA Bus Interior Vacuum Bellows System Upgrade
Electrical and control installation of NS Bus Vacuum System.
Contr.: NS Corporation
MTA Train Wash at Divisions 11 & 20
Electrical and control installation of NS Train Wash System.
Completed: March 2003
Contr.: NS Corporation
MTA C0656: DIV. 1, DIVI. 20, and Rebuild Center ADA Upgrades
Upgrade the existing fire alarm system at 3 locations for ADA compliance.
Completed: June 2002
Contr.: A&P Construction
MTA Gateway 2nd Floor Computer Room Expansion & Telecommunications Room Modifications
Provide AC power to air conditioning units and water coolers.
Contr.: A&P Construction
MTA Long Beach Platform Extension C0630
Extend PA, CCTV, PTEL, Lighting, Emergency Power on (19) platform extensions.
Completed: June 2001
Contr.: J.A. Jones Construction
MTA OP-3343-0515 : Underground Tank Replacement at MTA DIV. 8 Chatsworth
Installation of conduit, power, data, and control wiring to underground tank farms consisting of diesel, waste fuel, unleaded gas, motor oil, waste oil, torque oil and solvent tanks, transfer switches, emergency light, and fire alarm system.
Completed: February 1999
Contr.: A.E. Schmidt
MTA Division 2 Bus Maintenance Yard
Installation of new electrical system to maintenance building including main switchboards, panelboards, emergency generator & transfer switches, emergency light, and fire alarm system.
Completed: February 1999
Contr.: Now Construction
MTA Blueline Stations, Long Beach to Downtown L.A.
Installation of Variable Message signs and related AC/Comm. Cable to (22) Blueline Stations.
Completed: September 1996
Contr.: L.K. Comstock Company
|