LAX Signage and Wayfinding Project

Install power and lighting to new signage in CTA and to sign structures on Century/Sepulveda Blvd.’s.
Completed: 2004
Contr.:       Peterson/Chase Construction

MTA 03-0020 Vertical Storage Carousel at MTA Div. 11, 21, 22

Installation of power to Vertical Storage Material Parts Carousels.
Completed: 2004
Contr.:       A&P Construcrion

MTA CO678 – ADA Compliance at Division 5

Upgrade the existing fire alarm system.
Completed: April 2003
Contr.:     Larry Brown Construction

MTA CO651 – RRC Chemical Build & Employee Lounge

Electrical.
Completed: August 2003
Contr.:     A&P Construction

MTA Division 8 Vault Houses

Electrical and Communications installation of (2) Vault Houses.
Contr.:     A&P Construction

MTA Bus Interior Vacuum Bellows System Upgrade

Electrical and control installation of NS Bus Vacuum System.
Contr.:     NS Corporation

MTA Train Wash at Divisions 11 & 20

Electrical and control installation of NS Train Wash System.
Completed: March 2003
Contr.:     NS Corporation

MTA C0656: DIV. 1, DIVI. 20, and Rebuild Center ADA Upgrades

Upgrade the existing fire alarm system at 3 locations for ADA compliance.
Completed: June 2002
Contr.:      A&P Construction

MTA Gateway 2nd Floor Computer Room Expansion & Telecommunications Room Modifications

Provide AC power to air conditioning units and water coolers.
Contr.:       A&P Construction

MTA Long Beach Platform Extension C0630

Extend PA, CCTV, PTEL, Lighting, Emergency Power on (19) platform extensions.
Completed: June 2001
Contr.:       J.A. Jones Construction

MTA OP-3343-0515 : Underground Tank Replacement at MTA DIV. 8 Chatsworth

Installation of conduit, power, data, and control wiring to underground tank farms consisting of diesel, waste fuel, unleaded gas, motor oil, waste oil, torque oil and solvent tanks, transfer switches, emergency light, and fire alarm system.
Completed: February 1999
Contr.:       A.E. Schmidt

MTA Division 2 Bus Maintenance Yard

Installation of new electrical system to maintenance building including main switchboards, panelboards, emergency generator & transfer switches, emergency light, and fire alarm system.
Completed: February 1999
Contr.:      Now Construction

MTA Blueline Stations, Long Beach to Downtown L.A.

Installation of Variable Message signs and related AC/Comm. Cable to (22) Blueline Stations.
Completed: September 1996
Contr.:      L.K. Comstock Company